What We Offer
A warehouse or office roof has more strings, a combiner, and an AC output that lands on a board shared with the building. The device list is longer than a house, and the next building usually asks for the same part numbers. Pronto coordinates combiners, DC breakers and fuses, surge devices and residual-current protection against that specification.
Contact UsChallenges
String count and fuse rating copied from the last roof, not from this inverter input.
The combiner enclosure does not match the parapet, the cable entry or the weather on that roof.
Each buyer picks a different curve, so two buildings that should match do not.
The inverter current is landed on a breaker and a board that were sized for the building load only.
Playbook
Inputs, current per string, and whether they meet in a combiner or at the inverter itself.
Fuse or DC breaker per input, DC surge device at the combiner, enclosure matched to the roof.
Breaker, residual-current device and AC surge device sized for the inverter current, not only for the old building load.
The bill of materials is what the next building orders. It does not get rewritten on each enquiry.
Architecture
The drawing shows the path from the array to the grid. Pronto coordinates the low-voltage protection on that path. Modules, inverters and batteries are not part of the supply.
Products
Contact
String voltage, inverter model and the board schedule are enough to start a device list. Stock and delivery are checked from Poland, Hungary and China.